Start-Up
4-50
SINUMERIK 802S base line
Start-Up
4.7.5 Cycle start-up
Sequence of operations
When loading cycles into the control system, adhere to the following sequence
of operations:
1. Save tool offset data and zero offsets either on the FLASH or on the PG
(programming device).
These data can be selected in the Services menu by pressing the Data
outp./data...softkey.
2. Load all files of the selected technology path from the toolbox diskette
into the control system via the V24 interface.
3. Carry out POWER ON.
4. Reload the recovered data.