EasyManuals Logo
Home>ABB>Measuring Instruments>ACF5000

ABB ACF5000 User Manual

ABB ACF5000
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
40 ACF5000 FTIR ANALYZER SYSTEM | OI/ACF5000-EN REV. A
Installing the sample gas line
Installing the sample gas line
Observe the "Piping diagram" in the system documentation.
Connect the sample gas line to the gas sampling probe.
NOTICE Neither grease or lubricant may be used during installation of the sample
gas line. This can falsify the measured values.
The sample gas line from the gas sampling probe to the analyzer cabinet
must be inclined and run as close as possible in a separate channel. Wa-
ter pockets must not be allowed to form, especially at the sampling
point.
The sample gas line must be laid so as to avoid sharp bends, kinks and
the crossing of other lines. The minimum bending radius is 200 mm.
The heated sample gas line
must never be laid through walls if there is a possibility of subse-
quent sealing by means of sealing compounds, since this may dam-
age the sample gas line;
must not be laid in a cable channel;
must not be laid near other gas or power lines in a cable grid. This
applies in particular for closed cable grids.
Assemble the heated sample gas lines on freely-laid C-profiles using a
counterpart. Do not over-tighten.
Insert the sample gas line through the opening in the right-hand cabinet
wall.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB ACF5000 and is the answer not in the manual?

ABB ACF5000 Specifications

General IconGeneral
BrandABB
ModelACF5000
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals