- 69 -
000442BG
7 - Operation
Specifications on the operation of the LEDs
In correspondence to each status of the inverter indicated by the constant
or intermittent lighting of the specic LED, the display
05
also shows
a message identifying the operation which is being carried out or the
defect/anomaly recorded (see specic chapter).
In the case of malfunction it is extremely dangerous to intervene personally to try and elimi-
nate the defect. The instructions below must be followed scrupulously; if you do not have the
necessary experience and training to intervene safely, please contact a specialist.
LED insulation fault
Interventions after warning of insulation fault
When the red LED comes on, rst try to reset the warning by pressing the
multi-function ESC button on the keyboard
06
.
If the inverter reconnect normally to the network, the fault was due to
temporary phenomena.
You are advised to have the plant inspected by the installer or a specialist if this malfunction
occur repeatedly.
If the inverter doesn’t reconnect to the grid, isolate it on both the AC and
DC sides (by using the disconnect switches), then contact the installer or
authorised centre to repair the fault in the photovoltaic generator.

Table of Contents

Other manuals for ABB PVI-6.0-TL-OUTD

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVI-6.0-TL-OUTD and is the answer not in the manual?

ABB PVI-6.0-TL-OUTD Specifications

General IconGeneral
BrandABB
ModelPVI-6.0-TL-OUTD
CategoryInverter
LanguageEnglish

Related product manuals