EasyManuals Logo
Home>Baur>Test Equipment>DTA 100 C

Baur DTA 100 C User Manual

Baur DTA 100 C
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
DTA 100 C Maintenance
822-129-8 77 / 90
16.4 Replacing the fuse
Prerequisites
Mains fuse: 250 V / 4 A time lag, rated breaking capacity 1500 A (H)
Procedure
1 Latches
2 Fuse cartridge
3 Fuses
4 Groove
1. Press both latches (1) inwards and remove the fuse cartridge (2).
2. Replace the fuses (3).
3. Place the fuse cartridge (2) in the groove (4) so that it snaps in place.
16.5 Calibration
The product has been inspected, adjusted and calibrated for its functions before delivery.
The customer will receive a log which will also document the feedback of calibration
quantities. If required, a test and calibration log can be delivered with the proof of return of
the calibration to national and international standards.
BAUR GmbH recommends calibrating the device once a year to guarantee maximum
accuracy.
In case of questions, please contact BAUR GmbH or your local BAUR representative
(http://www.baur.eu/baur-worldwide).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baur DTA 100 C and is the answer not in the manual?

Baur DTA 100 C Specifications

General IconGeneral
BrandBaur
ModelDTA 100 C
CategoryTest Equipment
LanguageEnglish

Related product manuals