3-31
Cisco ASR-920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Aggregation Services Router Hardware Installation Guide
Chapter 3 Installing
Installing the Power Supply
Figure 3-21 Connecting the DC Power Supply Wires
Step 3
Close the DC power supply guard.
Powering On the Router
After the router is either rack mounted or mounted on the wall, perform these tasks to complete the
installation:
Step 1 Power on the router. See Figure 3-22