EasyManuals Logo
Home>Epson>Robotics>T3 Series

Epson T3 Series User Manual

Epson T3 Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #67 background imageLoading...
Page #67 background image
2. Installation
Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15 49
2.2 Unpacking
Installation and transportation of Manipulators and robotic equipment shall be
performed by qualified personnel and should conform to all national and local codes.
Using a cart or similar equipment, transport the Manipulator in the same
conditions as it was delivered. Observe the following when unpacking the
Manipulator.
2.2.1 Unpacking Precautions
Transportation procedure
: Only authorized personnel should perform sling work and operate a crane or
forklift. When these operations are performed by unauthorized personnel,
it is extremely hazardous and may result in serious bodily injury and/or
severe equipment damage to the robot system.
Vibration at transportation
: Avoid excessive vibration or shock during Manipulator transporting.
Excessive vibration or shock may cause equipment damage to and/or
malfunction of the Manipulator.
Anchor bolt
:
When removing the anchor bolts, support the Manipulator to prevent falling.
Removing the anchor bolts without supporting the Manipulator may get
hands, fingers, or feet caught as the Manipulator will fall.
Wire tie
: Do not remove the wire tie securing the arm until you
finish the installation.
You may get your hands caught in the Manipulator when the wire tie is
removed before completing the installation.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Epson T3 Series and is the answer not in the manual?

Epson T3 Series Specifications

General IconGeneral
BrandEpson
ModelT3 Series
CategoryRobotics
LanguageEnglish

Related product manuals