2. Installation
Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15 73
2.7.2 Power ON Procedure
(1) Check the EMERGENCY connector connection.
(2) Connect the TP bypass plug to the TP port.
(3) Connect the power cable to the Manipulator
(4) Connect the power cable to the power supply socket.
(5) The PROGRAM LED blinks approximately 30 seconds after Controller starts
up normally.
If the ERROR LED is turned ON or blinking, check connection in step (1) to
(4) and turn ON the power again.
If the ERROR LED is still ON or blinking, contact the supplier in your region.
Standard model, Cleanroom model