190 HyPrecision 50S/60S/75S Operator Manual 808690
9 – Installation
Installation
Receive and unpack the equipment
Unload the pump
Examine the pallet for cracks or damage.
Test the hydraulic controls on the lifting equipment before picking up a load.
Refer to the operation instructions for the lifting equipment.
Unpack the pump
Boxes and parts are frequently packed inside the pump, or in crates, boxes, and packaging. Look for
accessories and spare parts before discarding the packaging.
1. Remove the equipment from the shipping pallet. Use the leveling feet to level the pump on a flat surface.
2. Make sure that these items are included and complete.
Basic tool kit (optional)
Basic spare parts kit (optional)
This kit is usually inside the case for the basic tool kit.
The key for the LOCAL/REMOTE key switch
This is usually shipped inside the electrical enclosure.
A copy of the system schematic drawing
This is usually shipped inside the electrical enclosure.
3. Inspect the equipment to make sure that it was not damaged during shipping. If the equipment is damaged, a
claim must be filed with the carrier.
4. Make sure that the delivery and shipping documents match the equipment that was ordered and what was
received. Report shortages or damages to the OEM or to Hypertherm Waterjet within 10 days of receipt of
the equipment.
For easy reference, write the pump information on the Pump information page at the front of this manual.
WARNING
Misuse of lifting equipment can cause the load to become unstable, which can cause property
damage, personal injury, or death.
Lifting must be done by a trained operator. Follow all work site-safety requirements, the safety
instructions for the lifting equipment, and the safety information in this manual.