80
SECTION 3 - INDUSTRIAL APPLICATION
VECTOR 8 ENGINES
Base - April 2006 Print P2D32V001E
GENERAL OVERHAUL
Carry out every 5000 hours or at least once every 10 years
In addition to the operations at the previous level, change the following:
Cylinder liners
Cylinder heads
Damper
Pistons
Camshaft
High pressure fuel pump
Low pressure fuel pump
Wiring
Turbochargers
Turbocharger oil delivery/return pipes
Starter motor
Seals and gaskets
Oil pump
Oil pressure regulation valve
Gears
Oil exchanger
Oil l evel sensor
Oiljet pressure regulation valves
Air/oil/water heaters
Taper roller bearings on front casing
Crankshaft and camshaft bearings
Rockers and mounts
Roller tappets
Rocker shafts
Connecting rods
ENGINE REPLACEMENT
Carry out every 25000 hours or at least once every 25 years

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Iveco VECTOR Series and is the answer not in the manual?

Iveco VECTOR Series Specifications

General IconGeneral
BrandIveco
ModelVECTOR Series
CategoryEngine
LanguageEnglish

Related product manuals