Maintenance
Lubricating system
Fig. 64: Assembling rotor
u Assemble rotor cylinder 5 on rotor base 7.
u Mount rotor cover 8 and tighten nut to 40 Nm (30 ft-lb).
Fig. 65: Assembling the centrifuge
u Place rotor 3 in centrifuge base 1.
u Install cover 4 and tighten nut to 13 Nm (10 ft-lb).
u Check seal of V-clamp 2. Replace if necessary.
u Install and tighten V-clamp 2 to 15
±2
Nm (11
±1
ft-lb).
u Start and run engine for three minutes.
u Check engine oil level. (For more information see: 5.9.3 Checking the engine oil level —
SL001, page 112.)
5.9.6 Changing engine oil — SL101, SL121
q Preparatory maintenance activities are fulfilled. (For more information see: 5.5 Preparatory
maintenance activities, page 98.)
q A container with the required capacity is ready.
q Original KOHLER oil filters with the seals are available.
q A suitable drainage container is available.
118
© 2022 by Kohler Co. All rights reserved.
KD62V12 33521030301_8_1 EN_US 2022-09