MAINTENANCE MAINTENANCE PROCEDURE
4-49
EVERY 250 HOURS MAINTENANCE 4
Maintenance for every 50 hours service should be carried out at the same time.
LUBRICATE SWING CIRCLE 4
1. Lower the work equipment to the ground.
2. Using a grease pump, pump in grease through the grease
fittings shown by arrows. (2 places)
3. After greasing, wipe off any old grease that was pushed
out.