EasyManuals Logo

Komatsu WA75-3 User Manual

Komatsu WA75-3
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #126 background imageLoading...
Page #126 background image
OPERATING THE MACHINE
5-28
REMOVING THE MULTI-PURPOSE BUCKET
1. Lower the multi-purpose bucket onto level ground.
2. Switch off the engine.
3. Set the control lever for special equipment first to position 1
andthentoposition2 (fig. 75_042).
4. Turn the change-over lever for the supplementary control cir-
cuit to position 2 until it reaches the limit stop (fig. 75_160).
5. Disconnect the multi-purpose bucket hoses from the quick
couplings.
6. Restart the engine.
7. Unlock the quick-change unit by setting the control lever for
special equipment into position 1 (fig. 75_042).
8. Set the quick-change unit into the dumping position A (fig.
75_042) using the multi-function lever, until the quick-
change unit is unhooked of the work unitspickuphooks.
9. Make sure that nobody is behind the machine and drive the
machine away from the work unit.
2
1
75_160
75_04
2
2
3
0
1
75_016

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu WA75-3 and is the answer not in the manual?

Komatsu WA75-3 Specifications

General IconGeneral
BrandKomatsu
ModelWA75-3
CategoryCompact Loader
LanguageEnglish

Related product manuals