Driving modes
6.4 Main boom, removing/installing
Operating Manual GMK6300L 3 112 xxx en 6 - 37
xx.xx.xxxx
Connecting The number of hoses/cables depends on how the truck crane is equipped.
– The main boom must be raised.
• Remove the bridging plugs (1).
• Connect the plugs (2) to the sockets.
The assignment is given by the number of
poles and the shape of the plug.
• Connect all hoses (3).
The assignment is given by the size and col-
our designations.
• Lay the hoses/cables so that they will not be
damaged.
• Secure the clamps for the hoses;
à p. 6 - 28.
S
Risk of malfunction in the superstructure electronics!
Always turn off the ignition in the crane cab before you establish or sepa-
rate the electrical connection. This prevents malfunctions in the electronics
and corresponding error messages in the subsequent crane operation.