Rigging work
12.5 Starting the engine for driving for rigging work
12 - 24 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
• Press the (1) button down once.
The carrier ignition is turned on:
– The indicator lamp in the button (1)
flashes,
– The symbol (2) turns green.
• Press the button (5) once. The engine starts.
When the engine is running:
– The symbols (3) and (4) are displayed.
– The lamp in the button (1) lights up.
After starting
the engine
The engine runs at idling speed. The engine speed cannot be changed.
You can operate the functions from the crane cab in the Outriggers
submenu;
à p. 12 - 37.
In the event of a warning message on the carrier, the lamp (1) flashes.
• Press the button (2) once.
The
Warning submenu (carrier) opens. The corresponding symbol is red;
à p. 11 - 110.
Switching off
the engine
Your can turn off the engine from the crane cab or using any of the
emergency stop switches on the superstructure or the carrier.