Periodic Maintenance Schedule of Service Activities Periodic Maintenance
6 - 2 0070-10-0683 AS3000™ Service Manual
6.3 Periodic Maintenance Schedule of Service Activities
6.4 Visual Inspection Checklist
1. Verify that the AS3000 has no physical damage that would prevent operation.
2. Verify that the breathing circuit and CO
2
absorbent are present.
3. Verify that the vaporizers are filled but not overfilled.
4. Verify that the Preoperative Checkout List is attached.
5. Verify that the tank wrench is attached. (0367-00-0080)
6. Verify that the waste gas scavenger hose to the APL Valve (0004-00-0095) is not
damaged. Drain any moisture.
7. Verify that the O
2
, N
2
O, AIR, VAC and EVAC Supply Hoses (as applicable) are not
damaged.
8. Verify that the AC line cord is not frayed or damaged.
REQUIRED ACTION
AFTER
EACH
SERVICE
EVERY
12
MONTHS
EVERY
36
MONTHS
ADDITIONAL
INFORMATION
Check list before surgery X X
Visual Inspection Checklist X X
Replace of Consumable Parts X X
Battery Maintenance and
Replacement
X
Functional Tests X X
Preoperative Checklist X X X
O
2
Sensor Calibration: 21% X User to calibrate every 3
days. Service to
calibrate after initial
installation, and after
replacing the O
2
sensor.
O
2
Sensor Calibration: 100% X Service to calibrate
after initial installation,
and after replacing the
O
2
sensor.