Functional Tests Periodic Maintenance
6 - 38 0070-10-0683 AS3000™ Service Manual
6.8.11 Electrical Tests
CAUTION: Perform the electrical safety inspection as the last step after
completing a repair or after routine maintenance. Perform
this inspection with all covers, panels, and screws installed.
6.8.11.1 Convenience AC Outlets Test
1. Verify AC voltage is present at each AC outlet with the AS3000 Mains switch in both
the ON and OFF positions.
6.8.11.2 Electrical Safety Inspection Test
NOTE: Perform the electrical safety inspection as the last step after
completing a repair or after routine maintenance. Perform
this inspection with all covers, panels, and screws installed.
1. Unplug the Power cable(s) from the convenience receptacles at the rear of the AS3000.
2. Plug the AS3000 into a Safety Analyzer.
3. Connect the case ground lead of the analyzer to the U-blade ground of one of the
convenience receptacles. Perform the following tests with the case grounded:
• Normal polarity
• Normal polarity with open neutral
4. Perform the following tests with the case ungrounded:
• Normal polarity
• Normal polarity with open neutral
• Reverse polarity
5. Verify that the maximum leakage current does not exceed 300 µA (0.3 mA).
6.8.12 AS3000 Installation Checklist
Refer to section 2.0 (pg. 2-1) ‘‘Installation Guide’’ for the installation checkout procedure.
Complete each step to check the functionality of the anesthesia machine prior to clinical use.
Also, perform the installation checkout procedure after installation, reinstallation, servicing or
after any periodic maintenance activity. This checklist does not replace periodic maintenance
actions that must be performed to maintain peak performance.