EasyManuals Logo

NAiS FP0-C32T User Manual

Default Icon
173 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background image
Before You Start
FP0
iii
Matsushita Automation Controls
Power supply sequence
D
Have the power supply sequence such that the power
supply of the FP0 control unit turns OFF before the
power supply for I/O.
D
If the power supply for I/O is turned OFF before the
power supply of FP0 control unit, the FP0 control unit
will detect the input fluctuations and may begin an
unscheduled operation.
Before turning ON the power
When turning ON the power for the first time, be sure to take the precautions given
below.
D
When carrying out construction, check to make sure that
there are no scraps of wiring, particularly conductive
fragments, adhering to the unit.
D
Verify that the power supply wiring, I/O wiring, and power
supply voltage are all correct.
D
Sufficiently tighten the installation screws and terminal
screws.
D
Set the mode switch to PROG. mode.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NAiS FP0-C32T and is the answer not in the manual?

NAiS FP0-C32T Specifications

General IconGeneral
BrandNAiS
ModelFP0-C32T
CategoryController
LanguageEnglish

Related product manuals