27
Cylinder head
35
Fill the engine coolant system. See operation 20A-
02.
36
Connect the battery.
37
Bleed the fuel injection system, operation 19A-08.
38
Start the engine and check for leaks.
26
Check the fuel injection pump adjustment, opera-
tions 17A-03 and remove the adjustment drifts. Turn
the crankshaft two revolutions to ensure that there
is nothing preventing free movement.
27
Install the glow plugs, operation 22C-01.
28
Install the injectors, operation 19A-02.
29
Install the fuel delivery lines and tighten the connec-
tor nuts to 18 Nm. Ensure that a separate wrench is
used to prevent movement in the outgoing connec-
tions from the fuel injection pump.
30
Install the fuel filter and the low pressure fuel lines
between the fuel injection pump and the fuel filter.
31
Install the fuel supply pump if necessary, operation
19A-03. Connect the wiring to the fuel supply pump.
32
Install the cap of the timing cover, operation 15A-
01.
33
Connect the coolant by-pass hose and the outlet
hose for the coolant.
Connect the sea water pipes to the heat exchanger
and to the seawater pump.
34
Connect the wiring to the cylinder head and to the
thermostat housing.