Maintenance E 2200, E 3000ES
106 wc_tx001670gb.fm
7.12 Preparing the Machine for Seasonal Operation
Background
After removing the machine from long-term storage, it must be prepared for
operation. Perform the procedures below before each seasonal use.
Before
powering up
machine
Perform the procedures below before you power up the machine.
With machine
powered up
Perform the procedures below with the machine powered up.
Item Task
Machine exterior Clean all outside surfaces
Heater and burner
Remove protective coverings from chimney and
burner.
Remove any carbon buildup from the heater
and burner assemblies.
Replace the burner nozzle.
Verify burner electrode position.
Controls and wiring
Inspect all wires for damage, corrosion, or wear.
Replace damaged wiring.
Inspect all electrical components for damage,
corrosion, or wear. Replace damaged electrical
components.
HTF system
Inspect all hoses and couplings for wear or
damage. Replace damaged hoses and cou-
plings.
Clean the HTF strainer basket.
Fuel system Replace the fuel filter element.
Item Task
Burner
Verify fuel pump pressure.
Verify burner combustion.