Operation E 2200 / E 3000ES
36 wc_tx001667gb.fm
4.7 General Sequence of Operation
Follow the sequence of operation below. Refer to the specific topic for details.
Task When/Where See Topic
1. Check HTF level.
Before leaving for the job site.
Or, when at the job site before
daily operation.
4.10
2. Check fuel level.
4.10
3. Position the machine.
At the job site. 4.9
4. Connect power.
4.11
5. Perform “Pre-Starting” checks.
4.10
6. Start the generator (if equipped)
4.12
7. Preheat the HTF (if necessary) and
initiate HTF flow.
4.13. 4.14
8. Set the operating temperature.
4.15
9. Unwind and position the hoses.
4.16
10.Monitor the operating parameters.
4.17
11.Rewind the hoses.
4.19
12.Stop the machine.
4.18
13.Shut down and pack up the machine.
4.20