EasyManuals Logo
Home>Wacker Neuson>Heater>E 2200

Wacker Neuson E 2200 User Manual

Wacker Neuson E 2200
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #96 background imageLoading...
Page #96 background image
Maintenance E 2200, E 3000ES
96 wc_tx001670gb.fm
7.5 Filling the HTF Reservoir
Requirements
Genuine Wacker Neuson Heat Transfer Fluid
Machine is on a level surface
NOTICE: Use only factory-recommended Heat Transfer Fluid (HTF). Failure to
comply may damage the machine.
Background
The procedure for routine filling of the HTF reservoir differs slightly from that when
a low level fault is encountered. If your machine has experienced a low level fault,
see topic Resetting a Low HTF Level Fault.
Fill the HTF
reservoir
1. Remove the pin and move the fill valve (3) to the OPEN position.
2. Move the operation valve (2) to the CLOSED position.
3. Remove the fill hose from its storage location under the hose reel. Remove the
cap from the hose if a cap is provided.
4. Place the open end of the fill hose into a container of HTF.
This procedure continues on the next page.
wc_gr007807
2
3
3
2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E 2200 and is the answer not in the manual?

Wacker Neuson E 2200 Specifications

General IconGeneral
BrandWacker Neuson
ModelE 2200
CategoryHeater
LanguageEnglish

Related product manuals