E 2200 / E 3000ES Operation
wc_tx001667gb.fm 45
4.14 Initiating HTF Flow
Prerequisites
Heat Transfer Fluid (HTF) preheated. See topic Preheating the HTF
Hand protection
Note: If you are using accessories, see Chapter “Accessories”.
Procedure
Follow the procedure below to initiate HTF flow.
1. Verify that the operation valve (2) is in the OPEN position.
2. Verify that the fill valve (3) is in the CLOSED position. Lock it in the closed
position with the locking pin.
3. Close the cross connect valve (4).
This procedure continues on the next page.
CAUTION
Burn hazard. The hoses and components of the plumbing system may be very hot.
Hot hoses and hot plumbing components may cause severe burns.
f Wear hand protection when handling hot hoses or hot plumbing components.
wc_gr007786
2
3
2
3
wc_gr007815
4