BA 1404 en – Edition 2.7 * 1404b340.fm 3-71
Operation
Installing a bucket
Install a bucket only if it is positioned on level ground with the flat side facing
downward
Apply grease to the pins and joints before inserting the pins
Starts the engine
Straighten the stick so that bores D and E are flush
Insert greased pin F
Actuate the stick cylinder until bores H and I are flush
Insert the greased pin J
Install linch pins K
Quickhitch (option)
Danger!
The attachment must always be safely locked onto the quickhitch –
Accident hazard!
Before starting work, ensure that the attachment is securely locked onto the
quickhitch by means of the lock mechanism. You must be able to see the
lock on either side of the mounting bore of the attachment.
Re-equip as follows:
Approach the machine to the attachment
Pick up the bucket with coupling bar M and coupling claws L of the quickhitch
Engage lock mechanism N into mounting bore O
Place the bucket on level ground
Lock as follows:
Stop the engine
Insert tube P (included in scope of delivery) in clamping sleeve Q
Press the tube downward
The lock pins must be in position R
Unlock as follows:
Stop the engine
Insert tube P (included in scope of delivery) in clamping sleeve Q
Press the tube upward
The lock pins must be in position S

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E09-01 and is the answer not in the manual?

Wacker Neuson E09-01 Specifications

General IconGeneral
BrandWacker Neuson
ModelE09-01
CategoryExcavators
LanguageEnglish

Related product manuals