EasyManuals Logo
Home>Wacker Neuson>Excavators>E09-01

Wacker Neuson E09-01 User Manual

Wacker Neuson E09-01
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #90 background imageLoading...
Page #90 background image
3-48 BA 1404 en – Edition 2.7 * * 1404b330.fm
Operation
3.28 Crane-lifting the machine
Safety instructions
The crane and the lifting gear must have suitable dimensions
Crane-lifting the machine requires suitable lifting gear
Secure the machine against unintentional movement!
Check the cab for damage.
Danger!
Incorrect crane-lifting of the machine –
Accident hazard!
Ensure that no one is in the machine!
Have loads fastened and crane operators guided by experienced persons only!
The person guiding the crane operator must be within sight or sound of him
Ensure that the crane and the lifting gear (cables, chains) have sufficient
lifting capacity!
Raise the machine only if the standard bucket is empty
Stay clear of suspended loads!
It is essential that you read the safety instructions at the beginning of this
chapter and follow any other safety instructions relevant in your country!
Ensure that the lifting gear has the required lengths L1, L2, L3 and L4.
Caution!
Tighten the following screw connections to the specific torque before raising
the machine.
Retighten loose connections immediately. Contact an authorized workshop if
necessary
– see Threaded fittings and attachments on page 5-33.
Tighten both screws A to 110 Nm (81 ft.lbs).
Abb. 113: Cab attachment on rear wall
A
A

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E09-01 and is the answer not in the manual?

Wacker Neuson E09-01 Specifications

General IconGeneral
BrandWacker Neuson
ModelE09-01
CategoryExcavators
LanguageEnglish

Related product manuals