3-50 BA 1404 en – Edition 2.7 * * 1404b330.fm
Operation
Load the machine as follows:
Fit the standard bucket and lock it safely
Empty the standard bucket or remove the attachment
Tilt in the bucket
Fully raise the boom
Pull the stick toward the machine
Raise the stabilizer blade (it must be at the rear)
Stop the engine
Raise the control lever base
Remove the ignition key and carry it with you
Lock the upper carriage
Do not allow anyone to stay in the cab, and close the doors and the engine cover
Use suitable lifting gear, chains, etc.
Install the lifting gear at the point on the boom provided for lifting the machine
Install the lifting gear at the points on the stabilizer blade provided for lifting the
machine
Ensure that the lifting gear has the required lengths L1, L2, L3 and L4
Slowly raise the machine
Required lengths L1, L2, L3 and L4 of the lifting gear:
Abb. 118: Craning operation with lifting gear
L3
L1 L4L2
Length
Dimension
L1 2200 mm (87 in)
L2 3400 mm (10‘-10”)
L3 2000 mm (79 in)
L4 1600 mm (63 in)
Authorized loads Force
Boom lifting eye 40 kN (8992 lbf)
Stabilizer blade lifting eye 40 kN (8992 lbf)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E09-01 and is the answer not in the manual?

Wacker Neuson E09-01 Specifications

General IconGeneral
BrandWacker Neuson
ModelE09-01
CategoryExcavators
LanguageEnglish

Related product manuals