ACS2000 User manual 2UEA001270 Rev. F 5-3 (14)
Chapter 5 - Mechanical installation
5.4.2 Dimensions and clearances
See Layout drawing in Appendix D - Mechanical drawings, located on the
CD, for specific information on the dimensions of the drive and clearances
to be observed.
• Cabinet dimensions
• Clearances to be observed
• Mounting hole sizes
5.4.3 Base mounting
ABB recommends that the drive be attached to the floor during installation.
There is one acceptable means to attach the cabinet to the floor:
direct-to-floor mounting.
Floor mounting hardware is not supplied by ABB.
Figure 5-1 Anchor bolt
Anchor bolts as illustrated or hardware as specified in the chart are
recommended (see Figure 5-1).
5.4.3.1 Direct-to-floor mounting
The cabinet provides a slot in each corner of the base to attach the drive
to the floor.
Install the mounting hardware through slots outside the cabinet (see
Figure 5-2).
Figure 5-2 Direct-to-floor base mounting
Size Grade Dry torque value
M12 8.8 40 Nm
1/2 inch 5 45 ft-lbs
Legend
1 Slot for screw
2 Cabinet frame
12

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB ACS2000 and is the answer not in the manual?

ABB ACS2000 Specifications

General IconGeneral
BrandABB
ModelACS2000
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals