- 69 -
000511AG
5 - Installation
Closing the front cover
At the end of the inverter connection and conguration stage and before
proceeding with the commissioning, the inverter's cover must be closed.
During the installation of the cover, the installation sequence must be respected as well as
the tightening torque of the 8 screws (set out in the paragraph on technical data) in order to
keep the IP level of the inverter unchanged
• Insert and screw in the 8 xing screws.
Tighten the screws respecting the sequence and the tightening torque.
After having installed the front cover, it is possible to proceed with the
commissioning of the inverter.
IP65
1
8
6
5
7
3
2
4
Скачано с сайта интернет магазина https://axiomplus.com.ua/

Table of Contents

Other manuals for ABB UNO-3.0-TL-OUTD-S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB UNO-3.0-TL-OUTD-S and is the answer not in the manual?

ABB UNO-3.0-TL-OUTD-S Specifications

General IconGeneral
BrandABB
ModelUNO-3.0-TL-OUTD-S
CategoryInverter
LanguageEnglish

Related product manuals