EasyManuals Logo

Daikin FTXN24KVJU Service Manual

Daikin FTXN24KVJU
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #229 background imageLoading...
Page #229 background image
SiUS041111 Pump Down Operation
Trial Operation and Field Settings 221
1. Pump Down Operation
Outline In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail 1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 222 for forced cooling operation.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench

Table of Contents

Other manuals for Daikin FTXN24KVJU

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin FTXN24KVJU and is the answer not in the manual?

Daikin FTXN24KVJU Specifications

General IconGeneral
BrandDaikin
ModelFTXN24KVJU
CategoryAir Conditioner
LanguageEnglish

Related product manuals