GE HealthCare CONFIDENTIAL
Direction 5936427, Rev. 1 LOGIQ Totus Basic Service Manual
2 - 8 Section 2-2 - General LOGIQ Totus Requirements
2-2-4 Probe environmental requirements
Probes should be operated, stored, and transported according to the listed environmental requirements.
For specific information on environmental requirements for the probes, “Environmental Requirements”
in Chapter 3 of the Basic User Manual (latest revision).
NOTE: LOGIQ Totus environmental specifications may be different than the probes.
2-2-5 Time and manpower requirements
Time requirement
Site preparation takes time. Begin pre-installation checks as soon as possible. If possible, begin pre-
installation six weeks before delivery to allow enough time to make any changes.
Manpower requirement
Two persons for delivery and unpacking.
NOTICE
STORAGE TEMPERATURES VARY DEPENDING ON THE TYPE OF PROBE. WHEN EXPOSED TO
LARGE TEMPERATURE VARIATIONS, THE LOGIQ Totus AND PROBES SHOULD BE KEPT AT
ROOM TEMPERATURE BEFORE USE.
Refer to the table in "If the LOGIQ Totus is very cold or hot" on page 2-2 to determine the needed
settlement time.
CAUTION
RISK OF INJURY OR DAMAGE TO EQUIPMENT
HAVE TWO PEOPLE AVAILABLE TO DELIVER AND UNPACK THE LOGIQ TOTUS.
ATTEMPTS BY ONE PERSON TO MOVE THE LOGIQ Totus CONSIDERABLE DISTANCES,
OR ON AN INCLINE, COULD RESULT IN INJURY, DAMAGE, OR BOTH.