3
9850068 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
© Copyright Polaris Industries Inc.
3.35
8. If previously removed, install the two fasteners
retaining the fuel injector wiring bracket to the intake
manifold. Torque fasteners to specification.
TORQUE
Fuel Injector Wiring Bracket Fasteners:
7 ft-lb (10 Nm)
9. Connect the sensors, switches and injectors.
10.Connect three hinge clips
t
to the transmission vent
line.
11. Install zip ties retaining the wiring harness around the
intake manifold
wer
.
12.Install both hoses
q
going to the charge air cooler.
13.Install the exhaust pipe. See Exhaust Pipe Installation
page 3.21.
14.Fill the coolant bottle.
15.Install the cargo box.
16.Run the vehicle for several minutes and check the
coolant level. Refill as required.
ENGINE / COOLING SYSTEM