Chapter 8: Commissioning - SPX and SmartPilot systems
Chapter contents
• 8.1 SPX and SmartPilot autopilot installation on page 50
• 8.2 Pilot response on page 50
• 8.3 Initial setup and commissioning on page 51
• 8.4 Powering the Pilot controller on on page 51
• 8.5 Using the Set-up Wizard on page 52
• 8.6 Dockside calibration on page 53
• 8.7 Dealer settings on page 54
• 8.8 Adjusting the hard-over time — SmartPilot and SPX on page 55
• 8.9 Sea trial calibration on page 55
• 8.10 Checking autopilot operation on page 57
Commissioning - SPX and SmartPilot systems
49