15-6
Equipment
Manual OP7, OP17
Release 04/99
15.4 Testing the Configuration in OFFLINE Mode
In
OFFLINE
mode, you can test the dif
ferent functions and the configura
-
tions downloaded from the PC or PU independently of the PLC.
In OFFLINE mode, tags are not updated.
Step Procedure
1
Switch the OP to OFFLINE mode using the standard screen
System settings
!
OPMode.
2
Check all configured screens for proper display
.
3
Check the screen hierarchy
.
4
Check the input fields.
5 T
est the soft keys.
6
Check the dif
ferent items of message text.
7 T
est the function keys.
If errors occur when you perform the tests, you must download the configura
-
tion again.
Purpose
Procedure
End of test