Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not permitted
unless authorised by ŠKODA AUTO A. S. ŠKODA AUTO A. S. does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by ŠKODA AUTO A. S.
– Check the burr on the cable eye and remove with the reamer
if necessary.
– Position again the cable eye and screw on to the recommen‐
ded tightening torque.
Note
Optimal contact is ensured if the components to be bolted are
screwed to the recommended tightening torque after cleaning.
– After tightening the connection, treat it with the appropriate
preservative product ⇒ 6.5 , page 109 .
– Pay attention to the sequence when connecting the battery
⇒ Electrical System; Rep. gr. 27. .
6.3 Repairing screwed connections
Note
♦
It is not permitted to use rust solvent, contact spray or
grease on the screwed connection as the tightening tor‐
que via the thread to the screwed connection is exceeded
through the missing static friction and leads to the fracture of
the screwed connection.
♦
The grey grinding pads are suitable for slight contaminations
and “soft surfaces”.
♦
The red grinding pads are suitable for heavy contaminations
and “hard surfaces”.
Citigo 2012 ➤, Citigo-e iV 2020 ➤, Enyaq 2021 ➤, Enyaq Coupe 2021 ➤, Fabia 2000 ...
Electrical System - general notes - Edition 12.2021
106 Rep. gr.97 - Wiring