100
8.10.10 Load Control
Tap Settings→Energy Management Parameter→Load Control to enter the correspond-
ing screen, on which you can set Load Control Mode. Load Control Mode includes Timing
Mode, Switch Mode, and Intelligent Mode.
figure 8-22 Load Control
Timing Mode
In this mode, set the Load Timing Start Time 1 and Load Timing End Time 1, the system
will control the load operation during the interval. Take 09:00 am–09:30 am as an example.
figure 8-23 DO Operation in Timing Mode
Switch Mode
In this mode, the system will control the load operation according to the setting. In the follow-
ing example, the switch is set to OFF.
figure 8-24 DO Operation in Switch Mode
Intelligent Mode
The system will control the load operation according to the power optimization algorithm of
energy management.
During the setting interval, the DO function will be enabled to power on the load if the excess
PV energy exceeds the optimized power value.
Notice:
8 iSolarCloud App User Manual

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SH10T and is the answer not in the manual?

Sungrow SH10T Specifications

General IconGeneral
BrandSungrow
ModelSH10T
CategoryInverter
LanguageEnglish

Related product manuals