EasyManuals Logo
Home>Suzuki>Outboard Motor>DF140WT

Suzuki DF140WT User Manual

Suzuki DF140WT
616 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #330 background imageLoading...
Page #330 background image
DF140 “K2” (’02) MODEL 11-37
INSTALLATION
Installation is reverse order of removal with special attention to
the following steps.
Lower tilt rod to full down position.
Place the PTT unit in position, then install the clamp bracket.
Tighten the clamp bracket shaft nut to specified torque.
" Clamp bracket shaft nut:
43 N
.
m (4.3 kg-m, 31.0 lb-ft)
Apply Water Resistant Grease to the tilt cylinder lower shaft
and lower shaft bushes.
Install bushes 1 and cylinder lower shaft 2 to PTT unit.
N 99000-25161: Water Resistant Grease
Tighten lower shaft bolts 4, pre-coated with thread lock, to
specified torque.
J 99000-32050: Thread Lock 1342
" Cylinder lower shaft bolt:
50 N
.
m (5.0 kg-m, 36.0 lb-ft)
Install anode 5, then tighten bolts securely.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki DF140WT and is the answer not in the manual?

Suzuki DF140WT Specifications

General IconGeneral
BrandSuzuki
ModelDF140WT
CategoryOutboard Motor
LanguageEnglish

Related product manuals