EasyManuals Logo

Suzuki GSX-R750K3 2003 User Manual

Suzuki GSX-R750K3 2003
495 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #238 background imageLoading...
Page #238 background image
COOLING AND LUBRICATION SYSTEM 5-9
INSTALLATION
• Tighten the engine coolant temperature sensor to the specified
torque.
! Engine coolant temperature sensor: 18 N
.
m
(1.8 kgf
.
m, 13.0 lb-ft)
#
Take special care when handling the temperature sen-
sor. It may cause damage if it gets a sharp impact.
• Install the throttle body.
• Install the air cleaner box.
• Install the fuel tank. (4-51)
• Install the front and rear seats. (6-8)
• Pour engine coolant. (2-18)
• Install the under cowling. (6-5)
THERMOSTAT
REMOVAL
• Remove the under cowling. (6-5)
• Drain engine coolant. (2-18)
• Remove the front and rear seats. (6-8)
• Lift and support the fuel tank. (4-51)
• Remove the air cleaner box. (4-60 and -61)
• Remove the throttle body. (4-61 and -62)
• Remove the thermostat case.
• Remove the thermostat 1.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki GSX-R750K3 2003 and is the answer not in the manual?

Suzuki GSX-R750K3 2003 Specifications

General IconGeneral
BrandSuzuki
ModelGSX-R750K3 2003
CategoryMotorcycle
LanguageEnglish

Related product manuals