EasyManuals Logo
Home>YL Instruments>Laboratory Equipment>YL9100 HPLC

YL Instruments YL9100 HPLC User Manual

YL Instruments YL9100 HPLC
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #62 background imageLoading...
Page #62 background image
YL9111 Binary Pump
Chapter 4. Operation
There are four LEDs in front of YL9111 Binary pump.
POWER LED turns ON if main power turns on
CONNECTED LED turns ON if communication is connected,
LED blinks during connection
READY/RUN LED turns ON before analysis, LED blinks during analysis
Y
L9111
ERROR LED turns ON if there is error
4-1. Before Start
When using pump for the first time, initialize it through the following process in order to clean flow path
and condition high pressure seal. This process is necessary in case instrument is installed newly or is not
used for long time.
1) Prepare iso-propanol of HPLC grade.
2) Remove residual air bubble within instrument by turning prime/purge valve in counter clockwise
and loading iso-propanol of at least 50ml by Prime Start button.
3) Separate pump outlet tubing.
4) Press the sucked iso-propanol into syringe with prime/purge valve and discharge more than 5ml
to outlet of in-line filter.
5) Operate pump with instrument outlet open for 2-3 hours at 0.2ml/min flow rate and for 1 hour at
1.0ml/min flow rate using iso-propanol.
6) Perform process of 2) ~ 5) using solvent which will be used as a mobile phase.
7) Remove inside residual iso-propanol by operating it at 1ml/min flow rate for 30 minutes with
instrument outlet open.
8) Form flow path by connecting injector, column, and detector tubing mutually.
15

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YL Instruments YL9100 HPLC and is the answer not in the manual?

YL Instruments YL9100 HPLC Specifications

General IconGeneral
BrandYL Instruments
ModelYL9100 HPLC
CategoryLaboratory Equipment
LanguageEnglish