YL9112 Isocratic Pump
Chapter 3. Installation
3-1. Inspection and site preparation
YL9112 isocratic Pump is delivered along with the following parts when being shipped. Before opening
transportation package, perform inspection for trace of shock or mistake, and if there is abnormality, do not
open the contents and inform this company of it. And, if contents are opened, perform inspection for
existence of shock in the contents and contact with this company when trace of shock is found.
The Gradient Pump is a delicate instrument, so use original box and buffer material as far as possible
when re-packing it to transport instrument. If it is impossible to use original box; wrap pump with several
layers of buffer material, and fill the bottom, top and all other sides of pump with buffer material in order to
make pump endure shock or vibration during transportation.
L9112
Standard configuration of YL9112 isocratic pump
1) Main body of instrument
2) Power cord and fuse
3) Tubing 60cm,
A. Bio Narrow Bore : ID 0.01” , OD 1/16” PEEK
B. Analytical , Semi-prep : ID 0.02”, OD 1/16” SUS316
4) Installation kit
5) Manual
Site requirement of YL9112 isocratic pump
1) Room with 20℃ temperature with variation ± 5℃ with and 60% humidity
2) Where no direct and straight sunlight
3) Plain floor without carpet
4) Where having spare space of 20cm or more
5) Where there are 10% or less voltage change, no frequency change and 100Ω or less grounding
point
6) Where there is no generation of corrosive gas and ventilation is well done
7) Where stable power of 110 or 220V is supplied, ±10%
8) Where not receive electromagnetic induction from large transformer, high frequency heater, UPS,
etc.
9) Within 2500 m above sea level(storage within 4600m)
7