4.4.7 Replacing the POM sealing for the link system
Overview
The linkage consist of three basic parts - upper link arm, lower link arm and link.
How to replace the POM sealing is described in the same section as how to replace
the link, see Replacing the linkage - link on page 240.
X-ray view of the assembly of the link
The figure shows a X-ray view of the assembly of the link.
xx1100000212
A VK cover
B Lock nut
C Bearing
D Bearing
E POM Sealing
256 Product manual - IRB 460
3HAC039842-001 Revision: P
© Copyright 2012-2018 ABB. All rights reserved.
4 Repair
4.4.7 Replacing the POM sealing for the link system