EasyManuals Logo
Home>ABB>Robotics>IRB 640

ABB IRB 640 User Manual

ABB IRB 640
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #76 background imageLoading...
Page #76 background image
Repairs Link system
Product Manual IRB 640 33
5 Link system
5.1 Replacing upper and lower rod
Refer to foldouts 1:4 and 7
Dismounting:
Upper rod
1. Lock the tilt house <7/4>, through the tilt house into the upper arm with a
screw.
2. Unscrew KM-nuts <205.24> at both ends of the upper rod.
3. Attach a hoist to the rod.
4. Hold the tilt in balance.
5. Remove the upper rod.
Lower rod
The bearings can take a skew setting. But be careful.
6. Lock the tilt house <7/4>, through the tilt house into the upper arm with a
screw.
7. Loosen the upper rod at the tilt house.
8. Dismount cover <205.24> by deformation (a new cover must be fitted).
9. Remove KM-nut <205.6>.
10. Secure the link <205.40> so it cannot rotate when the lower rod is removed.
11. Remove screw <205.29>.
12. Dismount support washer <205.28> together with friction washer <205.32>.
13. Attach a hoist to the lower rod and remove it.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRB 640 and is the answer not in the manual?

ABB IRB 640 Specifications

General IconGeneral
BrandABB
ModelIRB 640
CategoryRobotics
LanguageEnglish

Related product manuals