122 Upgrade and Maintenance Manual TX100 S3 Core Edition
Main memory
10.2 Installing memory modules
10.2.1 Required tools
● Preliminary and concluding steps: tool-less
● Installing memory modules: tool-less
10.2.2 Preliminary steps
Before installing a memory module, perform the following steps:
Ê Shut down the server as described in section "Shutting down the server" on
page 40.
Ê Remove the AC power cord from the cable tie and disconnect it from the
system as described in section "Disconnecting the power cord" on page 41.
Ê Bring the server to its horizontal position.
Ê Open the side cover as described in section "Removing the side cover" on
page 43.
Upgrade and Repair Units (URU)
Average task duration: 5 minutes