GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-5 - Replacing Cables 8 - 69
8-5-12-3 Installation Procedure
1.) Parts to be installed in reverse order of removal
2.) Perform “Functional Checks after FRU replacement (Debrief Guideline)” as described in Section 8-
12 on page 8-223
5. Pull the ACDC Link Cable To UBE Cable to remove
from the console.
Steps Corresponding Graphic