CHAPTER 16
Powering On
•
Before You Power On the CTP2000 Platform on page 107
•
Powering On the CTP2000 Platform on page 107
•
Powering Off the CTP Platform on page 110
Before You Power On the CTP2000 Platform
Before powering on the device, make sure you complete the following tasks. See the
appropriate sections for information about these tasks.
WARNING: Be sure the power source is turned off and the device is turned
off before you perform the installation tasks.
•
Installing a CTP Interface Module, Processor Module, or Clock Module on page 89
•
Cabling a CTP2000 Interface Module on page 103
•
Cabling the CTP Platform for DC Power on page 103
•
Setting Up Management Access on the CTP2000 Platform on page 111
Related
Documentation
Powering On the CTP2000 Platform on page 107•
• Powering Off the CTP Platform on page 110
Powering On the CTP2000 Platform
NOTE: In this procedure we assume that the device is already connected to
a power source. If using a DC power supply, see “Cabling the CTP Platform
for DC Power” on page 103.
For specifications on the electrical requirements for the device, see one of the following
topics:
•
CTP2008 Platform Specifications and Certification on page 31
107Copyright © 2017, Juniper Networks, Inc.