EasyManuals Logo
Home>Juniper>Network Hardware>CTP2000 Series

Juniper CTP2000 Series Hardware Documentation

Juniper CTP2000 Series
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #84 background imageLoading...
Page #84 background image
WARNING: Be sure that circuit breakers for the power source are in the OFF
position before attaching power cables.
WARNING: Before servicing the device, turn off the power.
WARNING: Remove jewelry (including rings, necklaces, and watches) before
working on equipment that is connected to power lines. Metal objects heat
up when connected to power and ground and can cause serious burns or
become welded to the terminals.
CAUTION: Evaluate the overall loadingof the branch circuit before you install
any equipment into a rack.
Related
Documentation
Federal Communications Commission (FCC) Statement on page 73
FCC Requirements for Consumer Products on page 73
Food and Drug Administration, Center for Devices and Radiological Health on page 74
Compliance with Canadian Regulations on page 74
Before You Install a CTP Platform on page 37
Copyright © 2017, Juniper Networks, Inc.68
CTP2000 Hardware Documentation

Table of Contents

Other manuals for Juniper CTP2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Juniper CTP2000 Series and is the answer not in the manual?

Juniper CTP2000 Series Specifications

General IconGeneral
BrandJuniper
ModelCTP2000 Series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals