EasyManuals Logo
Home>Manitowoc>Construction Equipment>MLC300

Manitowoc MLC300 User Manual

Manitowoc MLC300
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #201 background imageLoading...
Page #201 background image
Manitowoc Published 11-20-19, Control # 234-19 4-55
MLC300 OPERATOR MANUAL SETUP AND INSTALLATION
3
1
4
Deploy Carbody Side Platforms
The carbody side platform assemblies (1, View A) are
shipped in the closed position attached to the carbody.
Deploy each carbody side platform assembly, as follows:
See Figure 4-41
for the following procedure.
1. Remove pins (2, View A) from the shipping holes (A).
2. Raise the platform assembly to the working position.
3. Install pins (2, View B) in the working holes B.
4. Rotate the folding platform (3) to the working position
(View C).
a. Remove the hair pin cotter (4, View D) pin (5) and
disconnect the link (6) from the pin.
b. Rotate the link (6, View E) down and pin it to the
stud (7) with hair-pin cotter (4).
5. Repeat the steps for the other carbody side platform.
6. DO NOT rotate the folding platforms (3, View C) to the
working position until after the crawlers are installed.

Table of Contents

Other manuals for Manitowoc MLC300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC300 and is the answer not in the manual?

Manitowoc MLC300 Specifications

General IconGeneral
BrandManitowoc
ModelMLC300
CategoryConstruction Equipment
LanguageEnglish

Related product manuals