MLC300 OPERATOR MANUAL SETUP AND INSTALLATION
3
1
4
Install the Boom Load Lines
1. Route the load lines up the boom. See Figure 4-114 on
page 4-170.
2. Pull the load lines approximately 20 ft (6,1 m) past the
end of the boom.
3. Install the load block(s) and hook-and-weight ball after
the boom is raised to a convenient height. See Boom
Raising Procedure on Boom Raising Procedure on
page 4-110.
If equipped, the rigging winch can be used to assist in
pulling the load lines. See Rigging Winch Operation on
page 4-168.
4. Read the following topics:
• Wire Rope Installation on page 4-161
• Load Line Reeving on page 4-171
• Wire Rope Specifications on page 4-171
• Reeving diagrams at the end of this section
Install Boom Block-Up Limit Components
Install the block-up limit components as shown in
Figure 4-73
.
• The chain and weight for the lower boom point are
stored on brackets in the boom top.
• The chain and weight for the upper boom point are
stored on brackets on the upper boom top.

Table of Contents

Other manuals for Manitowoc MLC300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC300 and is the answer not in the manual?

Manitowoc MLC300 Specifications

General IconGeneral
BrandManitowoc
ModelMLC300
CategoryConstruction Equipment
LanguageEnglish

Related product manuals