EasyManuals Logo
Home>Manitowoc>Construction Equipment>MLC300

Manitowoc MLC300 User Manual

Manitowoc MLC300
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #299 background imageLoading...
Page #299 background image
Manitowoc Published 11-20-19, Control # 234-19 4-153
MLC300 OPERATOR MANUAL SETUP AND INSTALLATION
3
1
4
Store Rotating Bed Left-Rear Platform and
Handrails
See Figure 4-101 for the following procedure.
1. Rotate the left-rear platform (9) from the working
position to the stored position.
2. Lower the handrail (6) from the working position and pin
it in the stored position.
Remove Rotating Bed Handrails
See Figure 4-101 for the following procedure.
The rotating bed has eleven handrails. The heaviest handrail
weighs 9 kg (20 lb).
1. Starting at the desired handrail (1-7), remove the safety
pins (8).
2. Lift the handrail out of the pockets in the platform.
3. Use a tagline to lower the handrail to ground personnel.
4. Reinstall the safety pins (8) in the pockets in the
platform.
5. Repeat the steps until all handrails are removed.
6. Securely attach the handrails to shipping pallets and
secure the pallets to a trailer.
Remove Rotating Bed Left-Rear Ladder
Reverse the installation steps to remove the left-rear ladder
(see Removing Ladder on page 4-25
or Removing Ladder
on page 4-27.
Secure the ladder to a trailer.

Table of Contents

Other manuals for Manitowoc MLC300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC300 and is the answer not in the manual?

Manitowoc MLC300 Specifications

General IconGeneral
BrandManitowoc
ModelMLC300
CategoryConstruction Equipment
LanguageEnglish

Related product manuals