SET-UP AND INSTALLATION MLC650 VPC-MAX™ OPERATOR MANUAL
4-14
Published 04-06-18, Control # 231-14
Preparing for Actuator Installation
See Figure 4-16 for the following procedure.
1. Rotate the live mast to 111.6° (minimum) (1, View A)
from its horizontal (shipping) position.
2. Adjust the wear plate scrapers (2, View B) on the VPC-
MAX actuator trolley (3, View B) to the highest position.
View A
Item Description
1 111.6° Angle (minimum)
2 Wear Plate Scraper (qty 2)
3 VPC-MAX Actuator Trolley
View B
FIGURE 4-16