EasyManuals Logo
Home>NEC>Network Hardware>iPasolink 200

NEC iPasolink 200 User Manual

NEC iPasolink 200
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
5-14 ODU MOUNTING
NWD-107460-02E Installation
3 Rotate the transition hub 90 degrees until timing pin locates in timing concavity,
Tighten six screws when transition hub is located. (Tightening torque is 5.0 N·m
±10%.
)
(3)) ODU Direct Mounting Type Antenna (RFS example)
Notes
1. The details are referred to the installation manual which is attached to
the antenna. The installation or removal of the antenna requires qualified
experienced personnel.
2. The antenna is set to V-polarization when shipped from the factory.
Vertical Polarized Application
Horizontally Polarized Application
Transition hub
Transition hub
Timing PinTransition Hub
RFS SB1
1. Unscrew the 4 screws M3 at the refined
steel ring,
2. Hold the feed tightly at the waveguide,
3. Rotate carefully the feed 90 degrees,
4. Mount the feed to the refined steel ring
and lock the 4 screws M3.
1. Loosen the 4 screws M3,
2. Hold the feed tightly at the waveguide,
3. Rotate the casting plate carefully the
feed 90 degrees,
4. Lock the 4 screws M3.
RFS C-Mount
Drain plug
Drain plug
Submission Prohibited
NEC Internal Use Only

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC iPasolink 200 and is the answer not in the manual?

NEC iPasolink 200 Specifications

General IconGeneral
BrandNEC
ModeliPasolink 200
CategoryNetwork Hardware
LanguageEnglish

Related product manuals