EasyManuals Logo

Olympus OER-Pro User Manual

Olympus OER-Pro
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #113 background imageLoading...
Page #113 background image
Chapter 4 Reprocessing Operations
107
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
6. Close the lid to drain the cleaning fluid and finish leak test. At this time, the
buzzer beeps and the main control panel displays [- -] to indicate the end of
testing.
Figure 4.30
Once the leak test air tube has been connected to a
nonreprocessed endoscope, the outer surfaces of the tube
should be disinfected. In this case, the leak test air tube
should remain connected to the endoscope for the entire
reprocessing cycle.
When 10 minutes have passed since the leak test started,
the water will drain and the test will finish automatically. At
this time, the main control panel displays the error code
[E92].

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Olympus OER-Pro and is the answer not in the manual?

Olympus OER-Pro Specifications

General IconGeneral
Power SupplyAC 100-240 V, 50/60 Hz
DisinfectionPeracetic acid-based disinfection
CompatibilityOlympus flexible endoscopes
Cleaning StagesDisinfection, Rinse
TypeAutomated Endoscope Reprocessor

Related product manuals